All road frontage site was deduced and filled to grade then paved with asphalt, sidewalks and parking stops. 50 designated parking spots, control gates and security lighting.
All road frontage site was deduced and filled to grade then paved with asphalt, sidewalks and parking stops. 50 designated parking spots, control gates and security lighting.
